Jim had to start the day by heading in for blood work before his physical next week.  Once he got home and had his delayed breakfast, he unloaded the transmission jack from the car and got it assembled.  He's really thrilled with the quality of this tool.


Then it wasn't long before he was back up on the roof.  He had to figure out how to disassemble all the flashing and trim from this gable end...


It was a lot of hard work, but he got it all off this side!


Then he had to make new flashing to go from the structure over the shingles...


A look at the crazy flashing at the end...



Flashing installed on the bottom and the other side of the trim work removed, plus last row of shingles down!


You can see the last row of shingles is all installed over the flashing...


Jim is going to tack up the siding pieces to protect the attic from the forecast rain...


Siding tacked in place - this roof looks amazing!



High 85.2/Low 62.1 - nice!