Sunday, April 18, 2021

4.18.2021

Now that the bathroom is all painted, time for some reassembling.  Putting the recessed toilet paper holder back in the wall...


Tank put back on the toilet and everything leak checked...


Jim is careful and covers the floor as best as he can when working, but lots of plastering, skim coating and painting left the floor in much need of cleaning.  Looks much better now!


Putting the sink back in place.  Jim hooked up all the plumbing so we are back to a fully-functional bathroom!


Jim put a coat of paint on the other side of the welding cart.  This is oil-based paint so it takes him awhile to clean out his gun after painting.


Always household maintenance - time to change the house water filter.  This is always kind of a messy job - Jim has shut-off valves here but water always seems to escape onto the floor a bit.  Good opportunity to then clean the floor!


Jim took the filter tube outside and cleaned it out.  Then the new filter is in and Jim is reassembling...


It's amazing being in the Control Room and looking at all the work Jim did in here to make us so warm, comfortable and safe in the house.  You tend to close the door and forget about it all (well, Jim never does!).  


High 53/Low 34


No comments:

Post a Comment