Sunday, April 11, 2021

4.11.2021

 This morning, Jim put in a receptacle that will be dedicated to the cooler and the dishwasher.  He had this wired specifically for the dishwasher when we had planned to put it in this location.


All done!


Then it was back to plastering in the wood shop bathroom...


Once he had done as much as he could there, he switched to plastering in the metal shop...


Then he did some metal work on his welding cart...


They had called for rain but it never did so we spent a bit more time outside near the end of the day.  Jim got out his chainsaw and cut some of the bigger trees...


Pulling vines behind the pole barn - we are getting this area in really good shape...


High 68/Low 40


No comments:

Post a Comment