Saturday, February 25, 2023

2.25.2023

Jim did some computer work this morning.  He also continued to work on his submission to Ferrell Gas for the destruction of our package box, including starting to work on some cost estimates.  This entire accident has such time implications, even without considering that it will have to be rebuilt and remounted. 

However, I think it felt good to get back in the shop and get his hands dirty a bit!  He started gluing up wood that will be used to make the seat backs of the benches...


In the metal shop, he got the vertical pieces all welded on, perfectly plumb and straight...


Doing grinding of the welds...


He went down to get the mail and apparently at least the UPS driver still figured out the box is usable.  Very sad looking.


Time to get ready for church!
High 17.2/Low 5.6 - cold!


No comments:

Post a Comment