Jim started working on the Corian top for the bathroom cabinet today, first using his trim router to smooth off all the glue that squeezed out from the joints...
Tuesday, February 7, 2023
2.7.2023
Monday, February 6, 2023
2.6.2023
Jim took a road trip today - he found a tailgate assembly for his 4Runner online at a junk yard near Cooperstown...
Sunday, February 5, 2023
2.5.2023
Yesterday it was -19° and today's high was 37° - almost a 60° swing!
Jim started sizing the edge pieces for the Corian top for the bathroom cabinet today...
Scraping the excess glue off the inside once it dried. Jim will keep it in the clamps for probably at least a day before starting to cut the edge design.
One of Jim's big goals this year is to do some preventative maintenance and replacement of parts on the furnace. He has been looking for a gas mixture analyzer and found one that is almost brand new on eBay.
![]() |
| High 37.2/Low 6.9 |
Saturday, February 4, 2023
2.4.2023
It was an unbelievably scary cold night and morning - our outdoor sensor showed we got to -19! But thankfully, all the hard work Jim put into the furnace system and house construction paid off because we had no issues and were nice and warm. We didn't lose power either, so we're grateful for that.
Jim did more computer work this morning while things were so bitter cold. Once in the shop, he trimmed the door sides...
The man door has to have an angle at the top to fit under the roofline of the pole barn lean to, so Jim cut that today...
And caulking around the inside edges...
Friday, February 3, 2023
2.3.2023
Obviously, it was an inside work day today. Jim did a lot of computer work this morning - he's continuing to work on the design for the banquette. In the shop, he trimmed the door...
Thursday, February 2, 2023
2.2.2023
Jim glued the new stile onto the door today...
Wednesday, February 1, 2023
2.1.2023
Jim trial assembled the pole barn lean to man door today...