 Jim painted the compressor control mounting board with a coat of Gravity this morning...


Then he figured out where he wanted to hang the small shop vac that we mostly use for the cars and got ready to mount it...


All done and it will be accessible to both cars here...


Then it was back to plastering - he first did all the corner work and then went back and worked on the seams and screws...


Looking good!


We decided to play outside for a bit - handpicking out rocks from the pile...


Using the excavator to spread out the rock pile a bit...


A full bucket ready to unload...


The wall is looking so fabulous!


High 61/Low 44


Sunday, October 4, 2020

10.4.2020

 Jim hung up his hose reel mounting board this morning in the auto bay...


Looks so good and Jim's glad to get it off the floor again!


Then he put all the faceplates back onto the receptacles...


Now that this bay is done, time to clean the floor.  It's hard to cover the floor when you're using scaffolding that has to be wheeled around, so we had a lot of plaster plops from doing the ceiling work.  Thankfully, with some water and a stiff brush, they come off pretty easily for the epoxied floor...


Once all the plaster was gone, we tried cleaning the residue off with a bucket...


But quickly decided that it would be better to spray it off with water...


Then squeegee off the excess water...


Jim repeated that a couple times but it looks fabulous now!


Jim made another mounting board for all his compressor controls - giving it a coat of primer...


Jim loves the paparazzi recording his every move - ha!


It was a beautiful fall day - we are going to start devoting some time to finishing up outside tasks before the weather turns.  So we got the Bobcat out and did some handpicking of rocks...


Putting them on the rock wall...


After we finished that load, we took a walk to the edge of the property (near where the tree butcher was working last year) to see if we could put some of our uglier rocks back there.  We found a trail that Jim had used before with the Bobcat where he could get back to one of the original rock walls that has been mostly destroyed over the last centuries.  He ended up taking two loads back there.

High 57/Low 40


Saturday, October 3, 2020

10.3.2020

Today was kind of a tying up of loose ends kind of day.  Jim got the hose reel mounting board painted...


Then he did some organizing of cabinets in anticipation of moving things into the finished auto bay.  This set of tool cabinets is going upstairs in the wood shop so he loaded them up into the Bobcat...


And brought them up to the nice patio where we then moved them inside...


Then a little clean up from concrete activities - loaded up the steel forms onto the Bobcat...


Unloaded them up on the top of the hill in our stash...


After doing some more clean up activities, Jim did a little trimming to wind out the day before coming in to get ready to watch Mass.
High 56/Low 33

 


Friday, October 2, 2020

10.2.2020

 I was still wavering a bit between the two colors for the Corian sink so I had Jim bring up a piece of our subway tile.  Whites are tricky - a lot of them aren't really white - and the subway tile was a perfect example.  It definitely has a creamier tone so we decided to go with White Frost (the top one in this picture).  Jim had to play phone tag most of the day with his Corian rep but finally got the sink and a piece of Corian ordered. 


Jim continued working on painting in the auto bay today - it's always tricky working around the air compressor...


It's all painted and looks fabulous!


Jim spent some time figuring out how he wanted to attach the compressor cord reel to the wall - he got a mounting plate positioned and fastening spots figured out...


Then he cut it to size, rounded the edges, and got a coat of primer on both sides...


Now Jim is able to do some final touches in this area.  The garage door opener came with this separate light fixture so Jim got that mounted on the wall...


High 57/Low 38



Thursday, October 1, 2020

10.1.2020

 Jim had to fast for his physical bloodwork so we had decided that when he was done at the lab we would use that as an excuse to have our first takeout/restaurant food since March when the world changed.  We decided to try a new doughnut place in Saratoga Springs that has been a huge hit - they open at 9:00 in the morning and are typically sold out and closed by noon.  


They have different selections all the time and even mini doughnuts so we got a few different kinds to sample - and they were all wonderful; the best doughnuts we've ever had.  They make fritters available at noon so we may have to try those sometime.


We brought the doughnuts home (okay, we actually ate one in the car) - once we were done, Jim headed back down into the auto bay.  He started putting up the lights on the newly-painted wall...


Both lights mounted and wired in - let there be light!


That job done meant that Jim can take apart the scaffolding in the auto bay now...


He got the frames taken up and stored in the shed and the platforms and cross braces put in the pole barn...


While he was in the pole barn, Jim went up into the attic and brought down my Halloween decoration boxes - hard to believe it's October already!

Then he started taping off the floor area to get ready for wall painting...


Starting the trim work...


Working with the small roller to get the corners and trim...


Then it was time to start working on the walls...


Continuing down the wall...


This wall is done and looks fabulous - he's doing the trim work on the back wall and will paint it tomorrow.


Our Corian sink color samples came in the mail today - can you tell the difference between White Frost and Glacier White?  We're going with the Glacier White (on the right side).  Jim will be able to call tomorrow and order the sink and another sheet of Corian - very excited!


High 64/Low 43