Jim did a little tweaking on the package drop box frame...
Tuesday, October 25, 2022
10.25.2022
Kyle bought an electric rebar bender for a job he was doing and brought it up for Jim to use. It was very cool to watch! He's making a hook to help move the car dollies...
Monday, October 24, 2022
10.24.2022
Jim continued doing the millwork on the bottom frame of the package drop box...
By milling out a small amount from the top, the support bars slide underneath so Jim can make a cleaner weld...
Really coming together!
Sunday, October 23, 2022
10.23.2022
Jim did some shop and clean up work this morning, including getting things all set up for our last concrete work of the year - pouring the post for the package drop box. This afternoon, we got to work - getting the pumpkin all hooked up to the Bobcat...
Then it was time to make trips up and down the hill, bringing the bucket of tools and equipment up first, then going back down to get the concrete box and those tools. He brought the box with the extra concrete up and cleaned it out on the upper driveway...
Saturday, October 22, 2022
10.22.2022
This was a picture perfect fall day - got into the mid-60s with lots of sunshine. Mom and I had some grocery store errands to do and we picked up another bag of concrete at Home Depot. Actually, picking it up is a misnomer - I sat in the car like a princess and some guy brought it out and put it in my car.
Jim got the curb off the front of the lean to this morning...
Then he got the concrete saw out and cut the last remaining bit that he couldn't get to with the curb in place...
Jim built some forms to hold the concrete tube into place both at the top and bottom...
Then we went down to the end of the driveway and Jim staked the frame into place...
Subscribe to:
Posts (Atom)



