Monday, September 29, 2014

9.29.2014

Jim was back at work dismantling everything he spent weeks putting up!  These are the anchor bolts set in the wall that will eventually help hold up the stairwell landing.


Jim is taking out the last turnbuckle and brace!  Things inside the site now look so big without all that stuff encroaching on the space.


After lunch, it was back to work on the membrane.  This nice flat wall with no ditch made it easier, even when Jim had to work off the ladder.


Four walls completely covered in membrane now!  Jim is going to power wash the back side of the building tonight before he leaves so that we can continue working around.


A peek inside with all the bracing off.

No comments:

Post a Comment