Friday, January 1, 2021

1.1.2021


Happy New Year!  A friend in Ohio sent this to me and I thought it was cute - definitely hope that 2021 brings us all peace, health and happiness!

Jim cut the Formica for both the access panel door and the lower sink base today...


Then started the glueing process, rolling on the rubber cement...


Glueing the formica on the sink base...


Letting the pieces dry...


Then Jim transitioned to the metal shop, taking apart the light switches...


Using the rasp to make sure the foamed area is completely flat before installing drywall...


Then Jim cut and installed the next piece of drywall.  Obviously another difficult piece with the box cutouts and another piece of conduit to work around.


Then Jim had to rewire the light switches and outlet to get everything back to being operational.  This wall section looks good - makes the whole area feel different.



High 32/Low 24 - winter weather advisory for ice/snow tonight




No comments:

Post a Comment