Friday, August 14, 2020

8.14.2020

Jim spent the day doing drywall - he did more coats on the dormer window area and the area below the top railing.  He cut and attached the final piece of drywall in the landing area...


Then starting to cover up the last of the house wrap in the stairwell by working above the door...


Fastening...


Basically the last piece of drywall to install in the stairwell!


Setting screws...


Jim put the J-channel on the ceiling piece he got installed yesterday.  This was a real workout to get the screws in this area - they had to go through two layers of heavy gauge steel.


But it all looks so good!


In the auto bay, we moved all the 1/2" drywall to a pile that Jim can work from that will allow him access to the wall for installing the drywall.


Working in the auto bay on putting the top screws through the steel frame and setting other screws.


High 82/Low 57 - beautiful!


No comments:

Post a Comment