Monday, March 21, 2022

3.22.2022

 Routing out the back of the medicine cabinet all done...


Showing us how the inner support pieces will fit...


The rough before piece on the left with the wood glued and the after with oak sides!


Doing some planing...


Doing the millwork on the second support...


All the accumulated man glitter!  Jim loaded it up in the back of his 4Runner at the end of the day and took it down to the end of the driveway where his sawdust buddy was supposed to pick it up.


High 48.7/Low 24.3


No comments:

Post a Comment